Actually, CYpark is awaiting 20MW Biomass in its landfill at ladang Tanah Merah to be official sign under BOT for 25year concession.
CYpark currently already operate in Tanah Merah landfill site to treat and dispose municipal solid waste. As the landfill is capable to generate biomass up to 20MW, CYPark is secure concession and sign feed in traffic concession with TNB, it will enable CYpark not only derive eanring from tipping charge on solid waste but also earning from generating power from biomass.
Currently, CYpark already derive Renewal energy from its 8MW solar and 2MW biogas in Pajang (NS) integrated renewal energy park. So far, it have newly install another 5MW solar, making total RE 15MW (8+5 MW solar+ 2 MW biogass)
CYpark also replicate these integrate renewal energy park in other 3 other landfill, namely Bukit Palang (NS), Rimba Terjun (Johor), Kuala Perlis (Perlis), totaling another 20MW solar + 5 MW biogas.
All in all, CYPark RE division will increse multifold these year onward from 8MW solar to total 33MW solar and 7MW biogas. If CYpark can secure tanah Merah Biomass RE, it will add another 20MW biomass in its RE portfolio